MBL- Biogas

Add to wishlist
Share
Category
Report Abuse

    BIOGAS PLANT

    PTT biogas system based on USR fermentation technology with our exclusive improvements and modifications, in order to cater to the Palm oil mill waste water to achieve the best unique fermentation process. At the same time, the matching process is tailored to achieve a complete biogas engineering system. The system using reinforced concrete-steel structure, enameled assembly material with service life time more than 30 years.

    POME TREATMENT & BIOGAS PLANT
    Designed for POME: Waste Water Treatment Designed for POME: Biogas
    Capacity : 15 – 30 tons per hour 90% ~ 95% COD & BOD Removal
    ( Subject to the water content or sludge content. To be further confirmed after site visit) USR Integrated Technology System
    BOD & COD : 60% – 70% Removal Enamel Tank Assembly or Reinforced Concrete with more than 30 years of service life
    Suspended Solid Recovery : 60% – 80% Pre-Treatment enhance biogas production
    Sludge Moisture : 70% – 80% Low sulfur content

    Reviews

    There are no reviews yet.

    Be the first to review “MBL- Biogas”
    MSM Official

    MSM Official

    Address: Jl. Kelapa Dua Wetan Raya
    Komp. PTB Blok 1A/11
    Jakarta Timur
    DKI Jakarta
    13730
    Indonesia

    Product Enquiry